LTA CONTRACT CR1086
Sewer and Water Diversion Works (Package D)
Avatar
LTA CONTRACT CR1086
Sewer and Water Diversion Works (Package D)

The CR1086 Project covers the construction of water and sewer diversion works along Ang Mo Kio Industrial Park 2, Ang Mo Kio Ave 3, Serangoon Garden Way, and Tavistock Avenue.
Read More
DTSS Phase 2 Project – Schedule 1 Contract 3
(Pasir Panjang Road / West Coast Drive)
Avatar
DTSS Phase 2 Project – Schedule 1 Contract 3
(Pasir Panjang Road / West Coast Drive)

The DTSS is a cost efficient and sustainable solution conceived by the PUB to meet Singapore’s long term needs for used water collection, treatment and disposal.
Read More
DTSS Phase 2 Project – Schedule 1 Contract 1
(Clementi Road / Sunset Way)
Avatar
DTSS Phase 2 Project – Schedule 1 Contract 1
(Clementi Road / Sunset Way)

The DTSS Phase 2 Schedule 1 Contract 1 is the second Deep Tunnel Sewerage System Project that was awarded to ALPCS in Y2019.
Read More
LTA CONTRACT CR1089
Sewer Diversion Works (Package F)
Avatar
LTA CONTRACT CR1089
Sewer Diversion Works (Package F)

The CR1089 Project covers the sewer diversion works along Pasir Ris Drive 1,2&4 and Pasir Ris Street 11.
Read More
PUB Contract 1150138
Proposed Sewers in Cairnhill Circle and Newton Circus Areas
Avatar
PUB Contract 1150138
Proposed Sewers in Cairnhill Circle and Newton Circus Areas

The CR1089 Project covers the sewer diversion works along Pasir Ris Drive 1,2 & 4 and Pasir Ris Street 11.
Read More
LTA Contract T3002
Advance Utility and Sewer Diversion at Tanjong Rhu and Katong Park Stations (Volume 1 of 2)
Avatar
LTA Contract T3002
Advance Utility and Sewer Diversion at Tanjong Rhu and Katong Park Stations (Volume 1 of 2)

In relation to Land Transport Authority’s extension to the Thomson East Coast Line, Utilities such as Sewer, Water, Power Cables, Telcos are required to be diverted out of the Station Footprint.
Read More
PUB Contract 1140599
Proposed Sewers in Tuas Avenue 2 & Tuas Avenue 10 Areas
Avatar
PUB Contract 1140599
Proposed Sewers in Tuas Avenue 2 and Tuas Avenue 10 Areas

A 5.2km with the internal diameters of Ø400mm to Ø1800mm proposed sewers along Tuas Avenue 2 & Tuas Avenue 10 Areas.
Read More
HDB Contract D/272/14
Construction of Outlet Drain No. 1 at Punggol North
Avatar
HDB Contract D/272/14
Construction of Outlet Drain No. 1 at Punggol North

The HDB Contract D/272/14 consists of the whole construction of Outlet Drain No. 1 across and along Punggol Way to the Punggol Reservoir.