LTA CONTRACT CR1086 Sewer and Water Diversion Works (Package D)
LTA CONTRACT CR1086
Sewer and Water Diversion Works (Package D)
The CR1086 Project covers the construction of water and sewer diversion works along Ang Mo Kio Industrial Park 2, Ang Mo Kio Ave 3, Serangoon Garden Way, and Tavistock Avenue.
Read More
DTSS Phase 2 Project – Schedule 1 Contract 3 (Pasir Panjang Road / West Coast Drive)
DTSS Phase 2 Project – Schedule 1 Contract 3
(Pasir Panjang Road / West Coast Drive)
The DTSS is a cost efficient and sustainable solution conceived by the PUB to meet Singapore’s long term needs for used water collection, treatment and disposal.
Read More
The DTSS Phase 2 Schedule 1 Contract 1 is the second Deep Tunnel Sewerage System Project that was awarded to ALPCS in Y2019.
Read More
LTA CONTRACT CR1089 Sewer Diversion Works (Package F)
LTA CONTRACT CR1089
Sewer Diversion Works (Package F)
The CR1089 Project covers the sewer diversion works along Pasir Ris Drive 1,2&4 and Pasir Ris Street 11.
Read More
PUB Contract 1150138 Proposed Sewers in Cairnhill Circle and Newton Circus Areas
PUB Contract 1150138
Proposed Sewers in Cairnhill Circle and Newton Circus Areas
The CR1089 Project covers the sewer diversion works along Pasir Ris Drive 1,2 & 4 and Pasir Ris Street 11.
Read More
LTA Contract T3002 Advance Utility and Sewer Diversion at Tanjong Rhu and Katong Park Stations (Volume 1 of 2)
LTA Contract T3002
Advance Utility and Sewer Diversion at Tanjong Rhu and Katong Park Stations (Volume 1 of 2)
In relation to Land Transport Authority’s extension to the Thomson East Coast Line, Utilities such as Sewer, Water, Power Cables, Telcos are required to be diverted out of the Station Footprint.
Read More
PUB Contract 1140599 Proposed Sewers in Tuas Avenue 2 & Tuas Avenue 10 Areas
PUB Contract 1140599
Proposed Sewers in Tuas Avenue 2 and Tuas Avenue 10 Areas
A 5.2km with the internal diameters of Ø400mm to Ø1800mm proposed sewers along Tuas Avenue 2 & Tuas Avenue 10 Areas.
Read More
HDB Contract D/272/14 Construction of Outlet Drain No. 1 at Punggol North
HDB Contract D/272/14
Construction of Outlet Drain No. 1 at Punggol North
The HDB Contract D/272/14 consists of the whole construction of Outlet Drain No. 1 across and along Punggol Way to the Punggol Reservoir.
Read More
Singapore LTA Contract CR1086
Sewer and Water Diversion Works (Package D)
Back to All Projects
Singapore PUB DTSS Phase 2 S1C3
Deep Tunnel Sewerage System
2,800m
Bored Tunnels
3.0m
Slurry TBM (largest diameter
Back to All Projects
Singapore PUB DTSS Phase 2 S1C1
Deep Tunnel Sewerage System
3,500m
Bored Tunnels
0.4m to 2.1m
(Internal diameter)
Back to All Projects
Singapore LTA CONTRACT CR1089
Sewer Diversion Works (Package F)
Back to All Projects
PUB Contract 1150138
Proposed Sewers in Cairnhill Circle and Newton Circus Areas
Back to All Projects
LTA Contract T3002
Advance Utility and Sewer Diversion at Tanjong Rhu and Katong Park Stations (Volume 1 of 2)
Back to All Projects
PUB Contract 1140599
Proposed Sewers in Tuas Avenue 2 and Tuas Avenue 10 Areas
Back to All Projects
HDB Contract D/272/14
Construction of Outlet Drain No. 1 at Punggol North